Veritas Storage Foundation for Oracle 5.0 Graphical User Interface Guide, HP-UX 11i v3, First Edition, May 2008

Adding a scheduled task
To automate a database task, you must add it to the scheduler.
To add a task to the scheduler
1
Access the scheduler wizard in GUI.
See Accessing scheduled tasks in the Java GUI” on page 31.
2
Enter the required authorization information for the host on which you want
to run the schedule:
User name
Password
By default, authorization is set to the database owner. If you are logged in as
the database owner, you do not need to specify a password.
3
Enter the task information:
Task name
Task status: Normal, Hold, or Invalid
Host name
4
Select a task:
Create a new database checkpoint
Create a database snapshot
Clone a database using checkpoint
Clone a database using snapshot
5
Click Next to add the appropriate task.
See To create a database checkpoint” on page 104.
See To create a database snapshot” on page 104.
See To clone a database using checkpoint” on page 105.
See To clone a database using snapshot” on page 105.
Viewing scheduled jobs
You can view all existing automated tasks.
Automating database tasks
Adding a scheduled task
102