LVM/VxVM and vPars sx2000 Upgrade
5
OVERALL UPGRADE FLOW
The overall upgrade flow is:
1. Determine what is configured in each nPartition.
2. Determine the procedure that you will follow for each nPartition.
3. For each nPartition, perform the applicable pre-upgrade steps based upon what is configured, including the final shutdown of each
nPartition.
4. Shutdown any non-HP-UX nPartitions.
5. Shutdown and power-off the complex.
6. Perform the physical hardware upgrade.
7. For each nPartition, perform the applicable post-upgrade steps based upon what is configured.