HP StorageWorks Data Replication Manager for Sun Solaris 7 and 8 with VERITAS Volume Manager 3.X Application Notes (AA-RQ6AD-TE, March 2004)

Augmented Failover, Failback, and Role Reversal Procedures
8 Data Replication Manager for Sun Solaris 7 and 8 with VERITAS Volume Manager 3.xApplication Notes
Chapter 7: Extended Planned Site Failover With Full Failback Procedure
On page 91, perform the following additional initiator site tasks prior to the
Sun Solaris-specific operations in step 3h:
Unmount the volumes, then deport the disk groups.
On page 100, perform the following additional target site tasks at the end of the
Sun Solaris-specific operations in step 5h:
Import the disk groups. Start the volumes, if not already started, then mount the
volumes.
On page 105, perform the following additional target site tasks at the end of step 1:
Unmount the volumes, then deport the disk groups.
On page 113, perform the following additional initiator site tasks at the end of the
Sun Solaris-specific operations in step 9h:
Import the disk groups. Start the volumes, if not already started, then mount the
volumes.
Chapter 8: Resumption of Replication After Extended Planned Loss of Target Procedure
No additional steps are required.
Chapter 9: Unplanned Site Failover With Failback To New Hardware Procedure
On page 131, perform the following additional target site tasks at the end of the
Sun Solaris-specific operations in step 14h:
Import the disk groups using the forced import, with the clear host ID flag. Start the
volumes, if not already started. Check the volumes using fsck, then mount the
volumes.
On page 156, perform the following additional initiator site tasks at the end of the
Sun Solaris-specific operations in step 14h:
Import the disk groups. Start the volumes, if not already started, then mount the
volumes.
Chapter 10: Planned Site Role Reversal Procedure
On page 159, perform the following additional initiator site tasks prior to the operations in
the Sun Solaris-specific operations in step 3h:
Unmount the volumes, then deport the disk groups.
On page 169, perform the following additional target site tasks at the end of the
Sun Solaris-specific operations in step 6h:
Import the disk groups. Start the volumes, if not already started, then mount the
volumes.
On page 170, perform the following additional target site tasks prior to step 1:
Unmount the volumes, then deport the disk groups.
On page 174, perform the following additional initiator site tasks at the end of the
Sun Solaris-specific operations in step 6h:
Import the disk groups. Start the volumes, if not already started, then mount the
volumes.