HP Fabric Clustering System HP-UX Administrator's Guide, March 2008

6. Attach the rails to the rack, both sides as shown in Figure 4-9 “ Attach Sliding Rail to Rack”.
CAUTION: Keep switch supported until rail is attached to the rack.
Figure 4-9 Attach Sliding Rail to Rack
7. Securely attach all rails to the rack.
Remove Shipping Sleeve
Underneath each power supply is a shipping sleeve. Take the bezel off and remove the entire
sleeve by gently pulling on the tab. Replace the bezel.
Figure 4-10 Remove Shipping Sleeve From Under Power Supply
Remove Support Bracket (if installed)
If switches are pre-installed in a rack, there will be a Support Bracket under each switch. This
should be removed after the rack is in its final location. The space should be filled with additional
equipment or a 1U filler panel.
Figure 4-11 Remove Support Bracket
Support Bracket
44 Installing HP Fabric Clustering System