List codewords
The link provides a list of all the codewords that have been created for a specified system serial
number. It also indicates if no codewords have been created. However, this link will not work with
HP Superdome 2 serial numbers as there are no codewords involved in this release. The functionality
will be available at a later release.
Temporarily activating and deactivating HP iCAP cores with
HP TiCAP or HP IAC
After purchasing and installing iCAP cores, five processing days of HP IAC are provided for each
core acquired. To access this capacity, the same process to acquire and use TiCAP is followed.
Before the workload demand for additional cores occurs, purchase and install temporary capacity on
the system. Each TiCAP enables any number of iCAP cores for a total of 30 processing days. When
additional cores are required, the cores can be immediately activated.
Figure 7: Process to temporarily activate iCAP cores
Note: IAC and TiCAP can be used on any partition in a server or GiCAP group but the tracking and
setup is done separately on each partition.
Install iCAP blades/
processors
Order TiCAP
Use iCAP commands to
distribute the IAC/TiCAP to the
appropriate partitions and
then activate IAC/TiCAP on
each iCAP core as necessary
When additional
processing capacity is
needed
Instantly activate cores
with TiCAP
(iCAPcommands)
When additional
processing capacity is no
longer needed
Deactivate TiCAP to
deactivate iCAP cores
(iCAP commands)