NetWare 4.1/9000 Concepts
1-4
NetWare Glossary
A
or three weeks.
For example, if 30% of the server’s charges are from service requests, the
network supervisor would want to recoup 30% of the cost through charging for
service requests.
At the end of the monitoring period, use ATOTAL to determine the total use for
each service. (ATOTAL is located in SYS:SYSTEM and requires the Supervisor
right.)
After establishing how much each service is used and the amount needed to
be made from each service, the network supervisor can calculate a charge
rate.
The charge rate is the charge per unit of the specified service. This rate
converts the amount of service used to a monetary figure. The unit is
arbitrary, but consider beginning with one charge unit equaling one cent.
Use the following formula to calculate a charge rate:
Figure 1-1 Charge rate formula
For example, a network supervisor needs to charge $100 per month for
blocks read. There are 250,000 blocks read each month. Therefore, the
charge rate is $100 (or 10,000 cents) divided by 250,000 blocks, or $.01 (1
cent) per 25 blocks:
Figure 1-2 Sample charge rate
CHARGE
(charge rate multiplier)
ESTIMATED USAGE
(charge rate divider)
= CHARGE RATE
10,000 cents
250,000 blocks read
= 1 cent / 25 blocks read