HP Systems Insight Manager 7.2 Technical Reference Guide
3. Click Delete.
NOTE: If an instance of the task is running, a message appears stating that you must stop
the running task instance before the task can be deleted.
Managing with tasks related information
Printing reports
Procedure 227 Printing a task results report
1. From the menu, select Tasks & Logs→View Tasks Results.
2. Click View Printable Report.
A Print Report Question appears, asking to generate a report containing the selected target
system or all target systems associated with the task instance.
3. Select the report to print.
4. Click OK to print the report.
Managing with tasks related information
Stopping a task
Procedure 228 Stopping a task instance
1. From the menu, select Tasks & Logs→View Task Results, and then select a task instance from
the Task Results list.
2. Click Stop. If the task instance is in a terminal state, Stop is disabled. If the task can be stopped,
a dialog appears, asking if you want to cancel or kill the selected task instance. If the tool
does not signify that the task can be stopped, the dialog box asks you to confirm the
cancellation of the task instance. Stopping a task attempts to interrupt In Progress commands.
Canceling stops pending systems from starting and enables Running or In Progress commands
to complete.
Managing with tasks related information
Configuring task results settings
HP SIM removes old tasks and jobs created by those tasks. A job is the results of a task that ran,
either as a scheduled task or as a manually ran task. Tasks are removed according to the rules in
the following procedure. HP SIM keeps the maximum configured counts, whichever comes first.
Keep task results longer results in slower response time in HP SIM. For large installations (2000
or more systems), HP suggests reducing the scheduled task configurations by one half. For example,
5 tasks and 15 days.
Procedure 229 Configuring task results settings
1. Select Options→Task Results Settings. The Task Results Settings page appears.
2. To set the schedule for removing scheduled task results, enter:
• Number of results
The default maximum number of results retained per scheduled task is 10.
• Number of days
The default number of days scheduled tasks are retained is 30.
One job is always retained.
344 Operations