HP Systems Insight Manager 7.2 Technical Reference Guide
Periodically
Procedure 210 Scheduling a task periodically
1. (Optional) Under In addition:, select from the following:
• Select Run when the central management server is started if you want the task to run
when the central management server is started.
• To run the task immediately, select Run now.
• Select Disable this task if you want to disable this task at any time.
2. Refine schedule:
6
Enter the time of day to
stop running the report
4
Enter the time of day
to run the report in the
1
Enter an increment of
how often to run the
report in the Every text
field.
in the at text field and
select AM or PM from
the dropdown list.
at text field and select
AM or PM from the
dropdown list.
2
Select day(s), week(s),
month(s), or year(s),
75
Optional.. Select Run a
maximum of and enter
Optional. Select Run
until and enter thefrom the dropdown
list. the maximum numberdate to stop running
of times to run thethe report in the text
field.
3
Select the day of the
week to run the report report in the times(s)
text box.from the on dropdown
list.
3. Click Done to save the scheduled report.
Click Previous to return to the Step 2: Schedule Report page.
Once
Procedure 211 Scheduling a task once
1. (Optional) Under In addition:, select from the following:
• Select Run when the central management server is started if you want the task to run
when the central management server is started.
• To run the task immediately, select Run now.
• Select Disable this task if you want to disable this task at any time.
2. Refine schedule:
330 Operations