HP SureStore E Tape Library Model 6/140 User's Guide

Getting Started
Installing the Library (for Authorized Service Personnel only)
Chapter 1 1-19
Getting Started
WARNING
Note the high leakage label on the back of the library before connecting power to
the library.
NOTE The AC power cord is the librarys main AC disconnect device and must
be easily accessible at all times.
7. Connect the power cord from the power distribution unit to a
grounded power receptacle, and power on the library. The power
(standby) switch is recessed and on the lowest level on the front of the
library.
After the power-up test is complete (after several minutes), you will
see the Home Screen on the librarys front panel. The Home Screen
displays the status of the drives and library. See Front Panel Status
Information (Home Screen) on page 2-5.
8. From the front panel, configure the library for Fibre Channel. See
Configuring the Library for Fibre Channel on page 3-15 for more
information.
9. Connect the remote management card (see Using the Remote
Management Card on page 3-9).
10.Power on the host.