Bridge FC4/2 Service and User Manual
Installation
23
2 INSTALLATION
Installation Overview
Unpack the Box
Test the SSB Unit
Preparation Checklist
Verify Requirements
Prepare the Tape Devices to be Moved (Optional)
Prepare the Disk Devices to be Moved (Optional)
Configure SCSI Devices
Mount the SSB in a Rack (HP A3511A)
Connect the SCSI Devices to the SSB
Test the SCSI Device Connections
Connect the SSB to the Host FC Adapter
Check the SSB to Host Connections
Relocating Logical Volumes
Logically Reconnecting Tape Libraries to the Host