HP StoreEver Enterprise Systems Library (ESL) G3 Tape Library I/O Management Unit Cooling Assembly Replacement Instructions

HP StoreEver Enterprise
Systems Library (ESL) G3 Tape
Library
I/O Management Unit
Cooling Assembly
Replacement Instructions
Abstract
This document describes how to remove and replace an
existing I/O management unit cooling assembly in an ESL
G3 Tape Library.
© Copyright 2013 Hewlett-Packard Development Company, L.P.
Printed in the US
*QN998-96090*
HP Part Number: QN998-96090
Published: May 2013
Edition: 2nd
CAUTION: Parts can be damaged by
electrostatic discharge. Keep parts in their
containers until needed. Make sure that you are
properly grounded when touching static sensitive
components.
NOTE: The I/O management unit cooling
assembly can be replaced without taking the
library offline. However, if the library is not
taken offline for the replacement procedure, an
event will be posted.
Inspect the contents of the kit
The kit contains one I/O management unit cooling fan
assembly.
You will also need the ESD strap that shipped with the
ESL G3 and a Phillips screwdriver.
Remove the existing cooling assembly
CAUTION: This is a time-sensitive procedure.
You must remove and replace the I/O
management unit cooling assembly in five
minutes or less. Taking more than five minutes
to complete this procedure could result in
damage to the library.
1. Open the service door of the module that contains
the cooling assembly to be replaced.
2. Attach the ESD strap to your wrist and to an
unpainted surface inside the door.
3. Locate the I/O management unit cooling assembly
to be replaced.
Page 1

Summary of content (2 pages)