HP SureStore E Disk Array XP512 Site Prep Guide

Preparing for Installation
67
Delivery Space Requirements
There should be enough clearance to move equipment safely from the
receiving area to the computer room. Permanent obstructions, such as
pillars or narrow doorways, can cause equipment damage.
Delivery plans should include the possible removal of walls or doors. the
physical dimensions were summarized on page 23.