HP SureStore E Disk Array XP512 Site Prep Guide
The Site Prep Team and Tasks
13
The Customer
As part of the site prep planning team, your responsibilities include
scheduling, planning, and preparing a suitable environment for the HP
SureStore E Disk Array XP512. Your site team may include a site specialist
for your computer room, a site electrician, and other site personnel
specializing in your site computer room. Responsibilities include proper:
• physical space necessary for proper subsystem function and
maintenance activity, including space and weight limitations and
system accessibility
• electrical power input including adherence to:
local building codes
local electrical codes
local safety codes
• connectors and receptacles, including
hardware or cables
network links
telephone equipment
equipment supplied by companies other than HP
• environmental requirements including:
temperature requirements
humidity limitations
• floor ventilation areas
• cable access holes
• RJ-11 analog telephone lines for Phone Home capabilities