HP StorageWorks XP10000 Disk Array Site Preparation Guide (AE102-96014, March 2008)

ReferenceNoYesCheck items*
The space planning process, page 25
Has a new floor plan been developed
to include the new array?
Floor clearance and cutout
requirements, page 26
Does the new floor plan include
adequate space for airflow and
servicing needs?
*
Floor clearance and cutout
requirements, page 26
Does the new floor plan include the
clearance required for the floor's load
rating?
*
General computer room
requirements, page 23
Air conditioning requirements, page
31
Is the computer room structurally
complete (walls, floor, air conditioning
system, and so on)?
*
Floor requirements, page 25
Is the floor strength adequate for the
equipment load?
*
Preventing electrostatic
discharge, page 23
Is antistatic flooring or mats installed?
Floor clearance and cutout
requirements, page 26
Are there cutouts or channels for cable
routing?
Data communication
requirements, page 36
Is there a dedicated analog telephone
line for the modem-based remote
support option (if chosen)?
Data communication
requirements, page 36
Is the infrastructure available for the
Internet-based remote support option (if
chosen)?
Data communication
requirements, page 36
Is a telephone line available for HP
representative use?
Data communication
requirements, page 36
Is a private LAN available?
Temperature specifications, page 31
Can the temperature be maintained
between 16 and 32 degrees C?
*
Temperature specifications, page 31
Can temperature changes be held to
less than 10 degrees C per hour?
*
Humidity specifications, page 32
Can the humidity level be maintained
between 20% and 80%?
*
Controlling dust and pollution, page
35
Preventing metallic particulate
contamination, page 36
Is the computer room protected against
dust, pollution, and metallic particulate
contamination?
*
Mechanical vibration
specifications, page 32
Acoustic specifications, page 35
Does the computer room support other
environmental considerations (such as
vibration and acoustics)?
*
XP10000 Disk Array Site Preparation Guide 13