HP StorageWorks Storage Mirroring Reporting Center user's guide (T2558-96324, April 2009)
5 - 3
Scheduling email reports
You can schedule when reports are sent.
1. Select Tools, Scheduled Report Editor. The Scheduled Report List dialog box appears.
2. In the Scheduled Report List, click New to add a new scheduled report, or select an existing
report and click Edit. The Scheduled Report Properties dialog box will appear.
3. In the Name field, enter a name to identify the scheduled report.
4. In the Description field, enter a description to identify the scheduled report (optional).