HP StorageWorks Scalable File Share System Installation and Upgrade Guide Version 2.2

System software installation checklistsC–2
C.1 Factory-installed system configuration checklist
Table C-1 Pre-installation checklist — factory-installed system
Task Related Section Task Complete?
1. Read the HP StorageWorks Scalable File Share Release
Notes.
Section 2.1
2. Set up access to the servers. Section 2.2
3. Plan the system information. Section 2.3
4. Plan the networks. Section 2.4
5. Plan the connection to the site network. Section 2.5
6. Plan the management network IP addresses. Section 2.6
7. Plan iLO access. Section 2.7
8. Assign roles to servers. Section 2.8
9. Assign storage arrays to servers. Section 2.9
10.Choose root user password. Section 2.10
Table C-2 Factory-installed system configuration checklist
Task Related Section Task Complete?
11.Reassemble the system. Section 4.2
12.Connect the system to the site network. Section 4.3
13.Verify that the system has been reassembled correctly. Section 4.4
14.Configure the local site parameters. Section 4.5
15.Verify the operation of the system. Section 4.6