HP StorageWorks 2000 Family Modular Smart Array chassis and midplane replacement instructions (481596-001, March 2008)
Page 4
Installing I/O modules
1. Loosen the controller’s thumbscrews; press the latches downward.
2. Slide the I/O module into the enclosure as far as it will go (1).
3. Press the latches upward to engage the I/O module (2); turn the
thumbscrews finger-tight.
Verifying component installation
• Reconnect cables and power on the system and associated data
host in the following order:
a. Drive enclosure first
b. Controller enclosure next
c. Data host last
• On the power-and-cooling modules, check that the AC Power
Good LED (top) is on.
• On the controller and I/O modules, check that the OK LED
(back) illuminates green, indicating that the module has
completed initializing and is online.
Additional information
See the MSA web site: http://www.hp.com/go/msa.
Service
Service
1
2
2