Compaq StorageWorks HSG60 ACS Solution Software V8.6 for Linux X86 and Alpha Installation and Configuration Guide
Configuration Procedures 5–11
Figure 5–3. Controller pair failover cabling
Configuring a Controller Pair Using CLI
To configure a controller pair using CLI involves the following processes:
■ Verify the Node ID and Check for Any Previous Connections.
■ Configure Controller Settings.
■ Restart the Controller.
■ Plug in the FC Cable and Verify Connections.
■ Repeat Procedure for Each Host Adapter.
■ Verify Installation.
Verify the Node ID and Check for Any Previous
Connections
1. Enter a SHOW THIS command to verify the node ID:
SHOW THIS
1 Controller A
2 Controller B
3 Host port 1
4 Host port 2
5 Cable from the switch to the host FC adapter
6 FC switch
CXO6887B
6
6
5
5
1
2
4
3