HP P6000 EVA Updating Product Software Guide (XCS 11001100) (5697-2328, November 2012)
2 Preparing for the upgrade
HP recommends that before starting the XCS upgrade, you perform tasks listed in Table 2 (page
9) to minimize the time required to complete the upgrade. The tasks you perform depend on your
system configuration and the HP P6000 Command View implementation. These tasks focus on
upgrading system components to ensure they meet the supported configuration for XCS 11001100.
NOTE: Be sure to record the XCS controller software version you are using. You will need this
information in the event that you must restore your XCS controller software. To create a restore
CD, see Creating a CD from the XCS Controller Software .ISO Image Read This First for your array
model (HP P6000 EVA or HP EVAx400).
Task checklist
Use the following checklist to track your progress and mark when a pre-upgrade task is complete.
Table 2 Pre-upgrade task checklist
Task completeTask
“Checking the controller software version” (page 10)
Time required: About 5 minutes
When to perform: Anytime before the upgrade
“Checking management software versions” (page 11)
Time required: 10–15 minutes
When to perform: Anytime before the upgrade
“Checking the array hardware” (page 12)
Time required: 15–20 minutes
When to perform: 1–2 weeks before the upgrade, and then daily until the upgrade is complete.
Provide enough time to order and replace any failed components.
“Checking and upgrading your SAN infrastructure” (page 14)
Time required: After collecting and evaluating your configuration data on over several weeks,
you can determine when is an appropriate time to do the upgrade.
When to perform: Anytime before the upgrade
“Evaluating your configuration” (page 22)
Time required: Varies
When to perform: As close as possible to the upgrade
“Selecting a time to perform an online upgrade” (page 24)
Time required: Varies
When to perform: As close as possible to the upgrade
“Managing host I/O timeouts for an online upgrade” (page 28)
Time required: Varies
When to perform: As close as possible to the upgrade
“Managing application I/O timeouts for an online upgrade” (page 32)
Time required: Varies
When to perform: As close as possible to the upgrade
“Managing external devices” (page 32)
Time required: Varies
Task checklist 9