HP StorageWorks ESL E-Series Tape Library Pre-installation Site Survey (358836-003, September 2007)

Table 4 Host bus adapters (HBA) interface information
Product nam e
Model name/driver
revision
Server (master or
client)
Connection t ype
(SCSI or FC)
#ofHBAports
Table 5 HBA driver information
File name
Version Comments
Table 6 Additional information
Table 7 Pre-installation requirements survey
Site ready criteria
Yes No
N/A
Receiving t he library—physical requirements
1. Is there a loading dock ( standard height) that is accessible by tractor-trailer?
2.Isthereaminimumoftwopeopleavailabletohelpuncratethelibrary?
3. Are pallet jacks or moving d ollies available?
4. Is there adequate space to uncrate the library?
5. Are tools for uncrating the library available? Need metal snips, 3/8-inch wrench (for
PX720), safety goggles, 7/16-inch wrench, and a carpenter's level.
Installation route requirements—receiving dock to installation site
6. Are the clearances of all doorways and elevators on the route adequate?
7. Is the route free of steps? (No steps should exist along route).
8. Will all ooring (route and installa tion site) support 1500 lbs. (680 kg) per library
frame?
9. Is the route free of carpet or obstacles that would impede caster movement?
NOTE:
Ifanysurveyquestionsareanswered"No",theremaybeadelayinlibraryshipment.Pleaserefer
to Table 9.
pre-installation site survey
5