HP StorageWorks ESL E-Series e2400-FC 4G Interface Controller Replacement Instructions (December 2005)

Use a #2 Phillips screwdriver to loosen the
captive screws in the black ejector handles at
both ends of the IC. Push the ejector handles
toward the outside, then pull on them to remove
the IC.
7
Identify the e2400-FC 4G interface controller (IC)
that is to be replaced. It is the right-most card in
the drive cluster.
5 6
9
Reconnect
the cables to
the new IC
exactly as
they were
connected to
the original
IC.
Take note of
the cable
connections
for easier
reconnection,
then remove
the cables
from the IC.
Replacement
8
Align the
replacement IC
with the guides
in the cluster
controller bay
and slide the IC
into the library.
Tighten the
captive screws.
ACT/
LNK
ACT/
LNK
PORT 1 PORT 0 ETHERNET
SERIAL
PWR
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 3
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 0 ETHERNET
SERIAL
PWR
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 3
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 0 ETHERNET
SERIAL
PWR
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 3
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 0 ETHERNET
SERIAL
PWR
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 3
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 0 ETHERNET
SERIAL
PWR
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 3
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 0 ETHERNET
SERIAL
PWR
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 3
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 0 ETHERNET
SERIAL
PWR
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
ACT/
LNK
ACT/
LNK
PORT 1 PORT 3
FIBRE
CHANNEL
FIBRE
CHANNEL
ACT/
LNK
PORT 2
FIBRE
CHANNEL
10
Flip the two breaker switches on at the power
distribution unit.