Maximizing Efficiency Through Data Replication Manager Data Movement Application Notes

Procedures and Examples
56 Application Notes - Maximizing Efficiency Through Data Replication Manager Data Movement
Example Display 62
RCS1 remote copy D1
Reported LUN ID: 6000-1FE1-0008-D4E0-0001-8290-1711-06A2
Switches:
OPERATION_MODE = SYNCHRONOUS
ERROR_MODE = NORMAL
FAILOVER_MODE = MANUAL
OUTSTANDING_IOS = 200
Initiator (BUILDNGB\D1) state:
ONLINE to this controller
Not reserved
Target state:
BUILDNGC\D1 is NORMAL
%EVL--BUILDNGB Top-> --23-JAN-2001 10:31:01 (time not set)-- Instance Code: 0E030064
.
.
.
Instance Code: 0E030064
T 14. Enable host access to the LUNs (refer to callout 8 on Figure 14). Use the following command:
SET UnitNumber ENABLE_ACCESS_PATH=HostIDs
Example: set d1 enable_access_path=BUILDNGCa,BUILDNGCb
The completes the Initiator and Target Site Movement Procedure example.