HP StorageWorks Data Replication Manager for Sun Solaris 7 and 8 with VERITAS Volume Manager 3.X Application Notes (AA-RQ6AD-TE, March 2004)
Augmented Failover, Failback, and Role Reversal Procedures
8 Data Replication Manager for Sun Solaris 7 and 8 with VERITAS Volume Manager 3.xApplication Notes
Chapter 7: Extended Planned Site Failover With Full Failback Procedure
■ On page 91, perform the following additional initiator site tasks prior to the
Sun Solaris-specific operations in step 3h:
Unmount the volumes, then deport the disk groups.
■ On page 100, perform the following additional target site tasks at the end of the
Sun Solaris-specific operations in step 5h:
Import the disk groups. Start the volumes, if not already started, then mount the
volumes.
■ On page 105, perform the following additional target site tasks at the end of step 1:
Unmount the volumes, then deport the disk groups.
■ On page 113, perform the following additional initiator site tasks at the end of the
Sun Solaris-specific operations in step 9h:
Import the disk groups. Start the volumes, if not already started, then mount the
volumes.
Chapter 8: Resumption of Replication After Extended Planned Loss of Target Procedure
No additional steps are required.
Chapter 9: Unplanned Site Failover With Failback To New Hardware Procedure
■ On page 131, perform the following additional target site tasks at the end of the
Sun Solaris-specific operations in step 14h:
Import the disk groups using the forced import, with the clear host ID flag. Start the
volumes, if not already started. Check the volumes using fsck, then mount the
volumes.
■ On page 156, perform the following additional initiator site tasks at the end of the
Sun Solaris-specific operations in step 14h:
Import the disk groups. Start the volumes, if not already started, then mount the
volumes.
Chapter 10: Planned Site Role Reversal Procedure
■ On page 159, perform the following additional initiator site tasks prior to the operations in
the Sun Solaris-specific operations in step 3h:
Unmount the volumes, then deport the disk groups.
■ On page 169, perform the following additional target site tasks at the end of the
Sun Solaris-specific operations in step 6h:
Import the disk groups. Start the volumes, if not already started, then mount the
volumes.
■ On page 170, perform the following additional target site tasks prior to step 1:
Unmount the volumes, then deport the disk groups.
■ On page 174, perform the following additional initiator site tasks at the end of the
Sun Solaris-specific operations in step 6h:
Import the disk groups. Start the volumes, if not already started, then mount the
volumes.