Compaq StorageWorks Data Replication Manager HSG80 ACS Version 8.5P Operations Guide
Configuring a Data Replication Manager Solution 4–39
The host is now connected to the initiator site via the multi-mode, 50-micron fiber optic
cables. Your cabling should appear as it does in Figure 4–10.
NOTE: You may choose any available port to connect your cables to, but you must maintain that
identical scheme at the target site. In other words, If port 1 of controller B is connected to port 2
of the bottom switch at the initiator site, then port 1 of controller B must be connected to port 2
of the bottom switch at the target site.
Figure 4–10. Cabling between the hosts and the switches
The cabling at each site is now complete. The initiator and target sites should be cabled
according to the layout shown in Figure 4–11.
CXO7091A
1
2