Compaq StorageWorks Data Replication Manager HSG80 ACS Version 8.5P Operations Guide
Configuring a Data Replication Manager Solution 4–7
The first step to getting your DT system up and running involves setting up and
configuring the controllers. These tasks are outlined below:
1. Ensure that all BA370 enclosures, Fibre Channel switches, Power Distribution Units
(PDUs), and the main power supply are off.
2. Plug all cabinet PDU power cords into the main power receptacles.
3. Be sure that you have a serial connection to each of the controllers.
4. Apply power to the main power source.
5. Turn on all PDUs.
6. Ensure that the Fibre Channel switches are powered on but not cabled.
7. Turn on the BA370 cabinets.
NOTE: When the BA370 cabinets are turned on, the controllers will boot if the PCMCIA cards are
already installed. If there are no cards in the controller slots, insert them now, and depress the
reset button.
8. Establish a local connection to the controller. Refer to the HSG80 Array Controller
ACS Version 8.5 Maintenance and Service Guide for instructions.
9. Verify that all controllers are on and functional by looking for the CLI prompt on the
maintenance port terminal.
NOTE: Unless otherwise noted, all operations may be conducted from controller A.
10. Issue the following CLI command:
SHOW THIS_CONTROLLER
You should see a display similar to that contained in Example Display 1.
Example Display 1
Controller:
HSG80 ZG8nnnnnnn Software V85P, Hardware E03
NODE_ID = nnnn-nnnn-nnnn-nnnn
ALLOCATION_CLASS = 0
SCSI_VERSION = SCSI-2
Not configured for dual-redundancy
Controller misconfigured -- other controller present
Device Port SCSI address 7
Time: NOT SET
Command Console LUN is disabled
Host PORT_1:
Reported PORT_ID = nnnn-nnnn-nnnn-nnnn
PORT_1_TOPOLOGY = OFFLINE (offline)
Host PORT_2:
Reported PORT_ID = nnnn-nnnn-nnnn-nnnn