Compaq StorageWorks Data Replication Manager HSG80 ACS Version 8.5P Operations Guide
4–6 Compaq StorageWorks Data Replication Manager HSG80 ACS Version 8.5P Operations Guide
❏ LUNs.
■ Connect Fiber Optic Cables Between the Controllers and Switches.
■ Connect the Initiator Site to the External Fiber Link.
■ Create Controller Connections.
■ Enable Controller Connections on Target and Initiator Units.
■ Create Remote Copy Sets.
❏ Create Log Unit and Association Sets (optional).
■ Set Failsafe at the Initiator Site (optional).
■ Configure the Host.
❏ Install the Host Bus Adapters and Drivers.
❏ Install Operating System.
❏ Install Secure Path for Windows NT.
❏ Install SWCC (optional).
❏ Connect Fiber Optic Cables Between the Hosts and the Switches.
❏ Rename the Host Connections on the Controllers.
❏ Enable Access to the Hosts on the Initiator Controllers.
■ Verify System Operation.
Each of these steps is detailed in the following sections.
Configure the Controllers at the Target Site
Prior to configuring the controllers at the target site, be sure to follow these preparatory
steps:
■ Identify the worldwide name on the host bus adapters.
■ Establish the name that you will assign to the target and initiator sites. Use a naming
convention that will be meaningful such as building or city names, for example,
Initiator site = BuildngA and Target site = BuildngB.