Compaq StorageWorks Data Replication Manager HSG80 ACS Version 8.5P Operations Guide

Configuring a Data Replication Manager Solution 45
Configuring Overview
Both the initiator and target sites need some type of CLI interface to the controller. You
can connect the serial maintenance port of both the initiator and target site controllers to a
terminal from which you issue CLI commands. You can also start a terminal emulator
session on Windows NT. Use the HyperTerminal emulator. Settings are: 9600 baud, 8 bits,
No parity, 1 stop bit, XON/XOFF.
The procedures for configuring a DT system using the controllers serial maintenance port
and CLI commands are as follows:
Configuration Procedures
TARGET SITE
Configure the Controllers at the Target Site.
Configure the Storage at the Target Site.
Devices and StorageSets.
LUNs.
Disable Access to Units.
Connect Fiber Optic Cables Between the Controllers and Switches.
Connect the Target Site to the External Fiber Link.
Configure the Host.
Install the Host Bus Adapters and Drivers.
Operating System Setup.
Install Secure Path for Windows NT.
Install SWCC (optional).
Connect Fiber Optic Cables Between the Hosts and the Switches.
Rename the Host Connections on the Controllers.
INITIATOR SITE
Configure the Controllers at the Initiator Site.
Configure the Storage at the Initiator Site.
Devices and StorageSets.