Compaq StorageWorks Data Replication Manager HSG80 ACS Version 8.5P Operations Guide
Getting Started 3–5
CAUTION: If the Fibre Channel optical cable is not properly connected to the
controller, failure may result. Because of the cable’s frail nature, it must also be
regularly maintained, or its performance and life span will be affected. Before
proceeding, it is important to administer the precautionary measures detailed in the
HSG80 Array Controller ACS Version 8.5 Maintenance and Service Guide.
The tables (below) provide an overview of the connections that you will need to make at
and between each site. Specific connection information is covered in more detail in the
Configuration chapter. Do not make any connections at this time.
Initiator Site Target Site
Host Port 1
➔
Top Switch, Port 0 Host Port 1
➔
Top Switch, Port 0
Host Port 2
➔
Bottom Switch, Port 0 Host Port 2
➔
Bottom Switch, Port 0
Controller A, Port 1
➔
Top Switch, Port 2 Controller A, Port 1
➔
Top Switch, Port 2
Controller A, Port 2
➔
Top Switch, Port 4 Controller A, Port 2
➔
Top Switch, Port 4
Controller B, Port 1
➔
Bottom Switch, Port 2 Controller B, Port 1
➔
Bottom Switch, Port 2
Controller B, Port 2
➔
Bottom Switch, Port 4 Controller B, Port 2
➔
Bottom Switch, Port 4
Between Initiator and Target Sites
Top Switch, Port 6
➔
External Fiber Link
➔
Top Switch, Port 6
Bottom Switch, Port 6
➔
External Fiber Link
➔
Top switch, Port 6