Compaq StorageWorks Data Replication Manager HSG80 ACS Version 8.5P Operations Guide
Chapter 3
Getting Started
This chapter explains how to get your Data Replication Manager solution ready for setup.
NOTE: It a good idea to keep a copy of this manual at both the initiator and target sites, so as to
ensure a successful and identical setup at both sites. Two copies will also eliminate confusion if
more than one person is configuring Data Replication Manager.
The topics contained within the Site, Host, and Solution Preparation section are:
■ “Host Bus Adapter Requirements” on page 3–2
■ “Setting Up the Fibre Channel Switches” on page 3–2
■ “Setting Up the Fiber Optic Cables” on page 3–3
❏ “Host-to-Switch Connections” on page 3–4
❏ “Switch-to-Controller Connections” on page 3–4
Site, Host, and Solution Preparation
Before you start operating your DT subsystem, you will need to ensure that you have
enough clearance to install and store the subsystem(s) and have adequate power resources.
If you choose to use more than one cabinet, you will need to understand the proper
methods for positioning and joining them. In addition, you will need to have the proper
devices installed and verify that all of the BA370 components are in place.
To learn more about adding additional storage, refer to the RA8000 and ESA12000
Storage Subsystems User’s Guide.