Compaq StorageWorks Data Replication Manager HSG80 ACS Version 8.5P Operations Guide
I–3
Failures
at target site after failover
6–9
both fiber optic cables or switches
6–6
component
6–5
controller
6–5
network
6–7
notification
6–5
StorageWorks Command Console
6–6
Fiber optic cable
3–3
50 micron
3–4, 4–18, 4–38
9 micron
3–4
connecting between initiator controllers and
switches
4–30
connecting between target controllers and
switches
4–14
connecting hosts and switches at initiator site
4–38
connecting hosts and switches at target site
4–18
connecting target site to external fiber link
4–15, 4–31
failure of both fiber optic cables
6–6
multi-mode
1–6
single-mode
1–6
Fibre Channel gigabit switch
1–6
defined
1–6
failure of both switches
6–6
setting up
3–2
switch-to-controller connection
3–4
Forced errors
6–2
Fully-redundant power
1–7
G
GBIC. See Gigabit Interface Converter
Getting Help
xi
Gigabit Interface Converter
1–6
long-wave
1–3, 1–6
short-wave
1–3, 1–6
H
Hardware
components
1–2
Hardware redundancy
1–2
Host
configuring at initiator site
4–37
configuring at target site
4–17
enabling access at initiator site
4–42
host-to-switch connection
3–4
renaming connections at initiator site
4–41
renaming connections at target site
4–20
Host bus adapters
1–3, 1–7
installing at initiator site
4–37
installing at target site
4–17
requirements
3–2
worldwide name
3–2, 4–6
I
Initiator site
assigning worldwide name
4–24
configuring controllers
4–22
configuring devices and storagesets
4–28
configuring host
4–37
configuring LUNs
4–28
connecting controllers and switches
4–30
connecting hosts and switches
4–38
creating remote copy sets
4–32
disabling CCL
4–25
enabling access to hosts
4–42
enabling Data Replication Manager
4–28
failure modes in normal operation
6–7
installing host bus adapters and drivers
4–37
installing Secure Path
4–38
installing StorageWorks Command Console
4–38
naming
4–22
renaming host connections
4–41
setting failsafe
4–34
setting the fabric topology
4–27
L
Last Failure Log 4–9, 4–11, 4–13, 4–24, 4–26,
4–28
Link failure management
6–3
Log unit
2–9