FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Edge Switch 2/24 Installation Guide (AA-RTDWC-TE, July 2004)
Rack Mount Instructions
43Edge Switch 2/24 Installation Guide
Mounting the Slide Rails on the Sides of the Switch
Use these steps to install the slide rails on the sides of the switch as shown in
Figure 6. You will need a torque driver with a T10 Torx bit (not supplied in the
kit) and left and right slide rails to complete this procedure.
Note: You may want to remove the Edge Switch 2/24 power supplies, as this will
make the device lighter and easier to handle.
WARNING: Before removing the power supplies, review the
HP
StorageWorks Edge Switch 2/24 Service Guide
for details on removing
power supplies.
1. On the Edge Switch 2/24, remove the six screws (three screws per side) that
help hold the switch cover in place.
Note: Do not discard these screws, as you will use them to attach the slide rails.
2. Using the torque driver and the screws you removed earlier, attach the left and
right slide rails to the Edge Switch 2/24.