FW 08.01.00/HAFM SW 08.06.xx or later HP StorageWorks Edge Switch 2/24 Installation Guide (AA-RTDWE-TE, November 2005)
Table Of Contents
- Edge Switch 2/24 installation guide
- Contents
- Introduction to the Edge Switch 2/24
- Installing the Edge Switch
- Connecting the Edge Switch
- Edge Switch network addresses
- LAN-connecting the Edge Switch
- Setting up the HAFM appliance
- Using HAFM to configure the Edge Switch
- Setting the Edge Switch online and offline
- Configuring Edge Switch identification
- Configuring Edge Switch operating parameters
- Configuring fabric operating parameters
- Configuring switch binding
- Configuring preferred path
- Configuring ports
- Configuring SNMP trap message recipients
- Configuring, enabling, and testing e-mail notification
- Configuring and enabling call-home features
- Configuring and enabling Ethernet events
- Configuring, enabling, and testing call-home event notification
- Threshold alerts
- Creating new alerts
- Figure 30 Configure Threshold Alerts dialog box
- Figure 31 New Threshold Alerts dialog box-first screen
- Figure 32 New Threshold Alerts dialog box-second screen
- Figure 33 New Threshold Alerts dialog box-third screen
- Figure 34 New Threshold Alerts dialog box-summary screen
- Figure 35 Configure Threshold Alerts dialog box-alert activated
- Modifying alerts
- Activating or deactivating alerts
- Deleting alerts
- Creating new alerts
- Configuring SANtegrity Authentication
- Backing up HAFM configuration data
- Resetting configuration data
- Enabling the HAFM Basic interface
- Enabling Telnet
- Connecting the Edge Switch to a fabric
- Using the HAFM Basic interface
- Launching the HAFM Basic interface
- Setting the Edge Switch offline and online
- Configuring Edge Switch ports
- Configuring BB credit
- Configuring Edge Switch identification
- Configuring date and time
- Configuring Edge Switch parameters
- Configuring network information
- Configuring SNMP trap message recipients
- Enabling or disabling the CLI
- Configuring zoning
- Managing firmware versions
- Regulatory compliance and safety
- Technical specifications
- Index

Edge Switch 2/24 installation guide 35
12.Click Yes.
A message box is displayed (Figure 13).
Figure 13 Save Session dialog box
13.Click No to exit and close the HyperTerminal application.
14.Power off the workstation:
a. Select Start > Shut Down.
The Shut Down Windows dialog box is displayed.
b. Select Shut Down Windows > Shut down the Computer and click Yes to power off the
workstation.
15.Disconnect the RS-232 null modem cable from the Edge Switch and the workstation.
16.Replace the protective metal plate over the maintenance port.
LAN-connecting the Edge Switch
To connect the Edge Switch to the Ethernet LAN segment or the HP-supplied Ethernet hub:
1. Connect one end of the Ethernet patch cable (supplied with the Edge Switch) to the RJ-45
connector (labeled 10/100) on the left front of the chassis.
2. Connect the remaining end of the Ethernet cable to the LAN as follows:
• If the Edge Switch is installed on a customer-supplied LAN segment, connect the cable to the
LAN as directed by the customer’s network administrator.
• If the Edge Switch is installed on the HP-supplied Ethernet hub, connect the cable to any
available port on the hub.
3. Perform one of the following steps:
• If an HAFM appliance is delivered and available, go to .
• If an HAFM appliance is not available and the Edge Switch is managed through the HAFM
Basic interface, attach the Ethernet LAN segment to an internet connection and go to ”Using
the HAFM Basic interface” on page 69.
Setting up the HAFM appliance
To run HAFM software, you must set up and configure the HAFM appliance. See the
HP StorageWorks HA-Fabric Manager appliance installation guide for instructions on:
• Setting up the HAFM appliance
• Connecting the HAFM appliance to the LAN
• Configuring the network addressing for the HAFM appliance
• Setting the HAFM appliance date and time
• Creating HAFM user names and passwords