FW 08.01.00 McDATA Sphereon 4500 Fabric Switch Installation and Service Manual (620-000159-330, November 2005)
2
2-34
McDATA Sphereon 4500 Fabric Switch Installation and Service Manual
Installation Tasks
Unpack, inspect, and install the server as follows:
1. Inspect shipping container(s) for damage. If a container is
damaged, ensure a freight carrier representative is present when
the container is opened. Unpack shipping container(s) and
inspect each item for damage. Ensure packaged items correspond
to items listed on the enclosed bill of materials.
2. If any items are damaged or missing, call the toll-free telephone
number printed on the attached service label.
3. Perform one of the following:
• For a desktop installation, position the server on a table or
desktop as directed by the customer. Ensure a grounded AC
electrical outlet is available.
• For a cabinet installation, open the rack-mount kit and inspect
the contents. Refer to the enclosed bill of materials and verify
all parts are delivered. Install the management server in the
equipment cabinet. Refer to the 1U Server Rack-Mount Kit
Installation Instructions (958-000310) for instructions.
4. Connect the server to the customer-supplied Ethernet LAN
segment or Ethernet hub (private LAN interface):
a. As shown in Figure 2-16, connect one end of the Ethernet
patch cable (supplied) to the right RJ-45 adapter (LAN 2) at the
rear of the server.
Figure 2-16 1U Management Server Connections