FW 08.01.00 McDATA Sphereon 4500 Fabric Switch Installation and Service Manual (620-000159-330, November 2005)
McDATA Sphereon 4500 Fabric Switch Installation and Service Manual
I-6
Index
FRU replacement
power supply 5-8
SFP transceiver 5-5
tools required 5-3, 5-7
FRUs
description 1-2
illustrated parts breakdown 6-1
power supply 1-4
SFP transceiver 1-3
status LEDs 1-6
full-volatility feature
configure PFE key
EFCM Basic 2-26
Element Manager 2-53
description 4-18, 4-40
G
gateway address
change switch address 2-17, 2-30
management server default 2-50
switch default 2-1, 3-1
H
hardware log 4-29
I
identification (configure)
EFCM Basic 2-13
Element Manager 2-57
illustrated parts breakdown
front-accessible FRUs 6-2
miscellaneous parts 6-4
power cords 6-5
rear-accessible FRUs 6-3
IML switch 4-4
IML/RESET button
function 1-5
location 1-3
insistent domain ID 2-14, 2-59
installation tasks
summary 2-2
Task 1 - Verify installation requirements 2-4
Task 2 - Unpack, inspect, and install the
Ethernet hub (optional) 2-5
Task 3 - Unpack, inspect, and install the
product 2-8
Task 4 - Configure product at the
EFCM Basic Edition interface
(optional) 2-11
Task 5 - Configure product network
information (optional) 2-30
Task 6 - Unpack, inspect, and install the
management server 2-33
Task 7 - Configure server password and
network addresses 2-36
Task 8 - Configure management server
information 2-38
Task 9 - Configure Windows operating
system users 2-42
Task 10 - Set management server date
and time 2-44
Task 11 - Configure the call-home feature
(optional) 2-46
Task 12 - Assign user names and
passwords 2-47
Task 13 - Configure the product to the
management application 2-49
Task 14 - Record or verify server restore
information 2-50
Task 15 - Verify product-to-server
communication 2-51
Task 16 - Configure PFE key (optional) 2-53
Task 17 - Configure management server
(optional) 2-54
Task 18 - Set product date and time 2-55
Task 19 - Configure the Element Manager
application 2-57
Task 20 - Back up configuration data 2-71
Task 21 - Cable Fibre Channel ports 2-74
Task 22 - Configure zoning (optional) 2-75
Task 23 - Connect product to a fabric element
(optional) 2-75
Task 24 - Register with the McDATA
filecenter 2-77
internal loopback test
description 4-15, 4-36
EFCM Basic Edition 4-15
Element Manager 4-36
interop mode 2-17, 2-60