FW 08.01.00 McDATA Sphereon 4500 Fabric Switch Installation and Service Manual (620-000159-330, November 2005)

4-2
McDATA Sphereon 4500 Fabric Switch Installation and Service Manual
Repair Information
Power On Switch
To power on the switch:
1. One alternating current (AC) power cord is required for each
power supply. Ensure the correct power cords are available.
DANGER
Use the supplied power cords. Ensure the facility power
receptacle is the correct type, supplies the required voltage, and is
properly grounded.
2. Plug power cords into facility power sources and AC connectors
at the rear of the switch. When the first power cord is connected,
the switch powers on and performs power-on self-tests (POSTs).
NOTE: For high availability, plug the power cords into
separate facility power circuits.
3. During POSTs:
The green PWR LED on the switch front panel illuminates.
—The amber ERR LED on the switch front panel blinks
momentarily while the switch is tested.
The green LED associated with the Ethernet port blinks
momentarily while the port is tested.
The blue/green and amber LEDs associated with Fibre
Channel ports blink momentarily while the ports are tested.
4. After successful POST completion, the PWR LED remains
illuminated and all amber LEDs extinguish.
5. If a POST error occurs, go to MAP 0000: Start MAP to isolate the
problem.