FW 07.00.00/HAFM SW 08.06.00 McDATA Sphereon 4500 Fabric Switch Installation and Service Manual (620-000159-320, April 2005)

2
Installation Tasks
2-13
Installation Tasks
a. The green power (PWR) LED on the front panel illuminates.
b. The amber system error (ERR) LED on the front panel blinks
momentarily while the switch is tested.
c. The green LED associated with the Ethernet port blinks
momentarily while the port is tested.
d. The green/blue and amber LEDs associated with Fibre
Channel ports blink momentarily while the ports are tested.
8. After successful POST completion, the green power (PWR) LED
remains illuminated and all other front panel LEDs extinguish.
9. If a POST error or other malfunction occurs, go to MAP 0000: Start
MAP on page 3-6 to isolate the problem.
10. Perform one of the following steps:
If the switch is to be managed through the SANpilot interface,
go to Task 4: Configure the Switch at the SANpilot Interface
(Optional) below.
If the switch is to be managed through the management server
or a customer-supplied server, go to Task 5: Configure Switch
Network Information (Optional) on page 2-41.
Task 4: Configure the Switch at the SANpilot Interface (Optional)
To configure the Sphereon 4500 Switch from the SANpilot interface,
selectively perform the following configuration tasks according to the
customers installation requirements:
Configure switch ports.
Configure the switch identification, date and time, operating
parameters, fabric parameters, and network addresses.
Configure SNMP trap message recipients, enable the command
line interface (CLI), and configure the open systems management
server (OSMS) feature.
Configure administrator and operator passwords.
Install switch product feature enablement (PFE) keys.