FW 07.00.00/HAFM SW 08.06.00 McDATA Sphereon 4500 Fabric Switch Installation and Service Manual (620-000159-320, April 2005)
2
2-8
McDATA Sphereon 4500 Fabric Switch Installation and Service Manual
Installation Tasks
NOTE: To connect two hubs, use step b and step c (middle and
bottom hub instructions only).
5. Connect the U. S. power cord to the receptacle at the rear of each
hub and to an AC power strip. Use an 18-inch electrical extension
cord if required.
6. Connect the AC power strip to a facility power outlet. Power for
each hub switches on when the strip is connected to facility AC
power.
7. Inspect the front panel of each hub. Ensure each green Power
light-emitting diode (LED) illuminates.
Rack-Mount
Installation
Perform the following steps to install and configure up to three
Ethernet hubs in a Fabricenter equipment cabinet or a customer-
supplied 19-inch equipment rack. A pointed instrument (pencil tip or
bent paper clip), #2 Phillips screwdriver, and 1/8-inch Allen wrench
are required.
1. Secure one mounting bracket to each side of the first hub as
shown in Figure 2-3. Use the two brackets and four pan-head
Phillips screws (8/32 x 0.5-inch) provided.
Figure 2-3 Mounting Bracket Installation (Ethernet Hub)
2. Position the first hub in the equipment rack as directed by the
customer. Align screw holes in the mounting brackets with screw
holes in the rack-mount standards.
NOTE: The hub is 1.75 inches, or one rack unit (1U) high.
®
3
com
Baseline 10/100 Hub
3C16411
SuperStack 3
®