FW 07.00.00/HAFM SW 08.06.00 McDATA Sphereon 4500 Fabric Switch Installation and Service Manual (620-000159-320, April 2005)

3-40
McDATA Sphereon 4500 Fabric Switch Installation and Service Manual
This procedure is concurrent and can be performed while switch
power is on.
Perform the data collection procedure as part of FRU removal
and replacement.
If multiple power supply failures occurred, connect the switch to
facility AC power after both power supplies are replaced.
ATTENTION ! Do not remove a power supply unless a replacement FRU is
immediately available. To avoid product overheating, a removed power
supply must be replaced within five minutes.
Did fan module (power supply) replacement solve the problem?
NO YES
The switch appears operational. Exit MAP.
Contact the next level of support. Exit MAP.
7
A power supply failed POSTs (as indicated by FRU code 06) and
must be removed and replaced. Refer to RRP 2: Redundant Power
Supply on page 5-6.
This procedure is concurrent and can be performed while switch
power is on.
Perform the data collection procedure as part of FRU removal
and replacement.
If multiple power supply failures occurred, connect the switch to
facility AC power after both power supplies are replaced.
ATTENTION ! Do not remove a power supply unless a replacement FRU is
immediately available. To avoid product overheating, a removed power
supply must be replaced within five minutes.
Did power supply replacement solve the problem?
NO YES
The switch appears operational. Exit MAP.
Contact the next level of support. Exit MAP.