FW 07.00.00/HAFM SW 08.06.00 McDATA Sphereon 4500 Fabric Switch Installation and Service Manual (620-000159-320, April 2005)

Diagnostics
3-33
9
Is fault isolation being performed at the switch?
YES NO
Fault isolation is being performed at the SANpilot interface,
management server, or customer-supplied server. Go to
step 18.
10
Verify the switch is connected to facility power and is powered on.
a. Ensure the AC power cord associated with the power supply
(PS0 or PS1) is connected to the rear of the switch and a facility
power receptacle. If not, connect the cord as directed by the
customer.
b. Ensure the associated facility circuit breaker is on. If not, ask the
customer set the circuit breaker on.
c. Ensure the AC power cord is not damaged. If damaged, replace
the cord.
Continue to the next step.
11
Inspect the switch for indications of being powered on, such as:
At the front bezel, an illuminated PWR LED (green)
or ERR LED (amber).
Illuminated LEDs adjacent to Fibre Channel ports.
Audio emanations and airflow from cooling fans.
Does the switch appear powered on?
YES NO
Go to step 13.
12
Does inspection of a power supply indicate a failure
(amber LED is illuminated)?
NO YES
A redundant power supply failed. Go to step 8.
The switch appears operational. Exit MAP.