FW 08.01.00 McDATA Products in a SAN Environment Planning Guide (620-000124-510, November 2005)

3
3-58
McDATA Products in a SAN Environment - Planning Manual
Planning Considerations for Fibre Channel Topologies
11. Verify cascaded FICON operation - Have the customer verify
operation of established logical FICON paths between channels
and control units, and verify that cascaded FICON traffic is
transmitted through the fabric as expected.