FW 07.00.00/HAFM SW 08.06.00 McDATA Sphereon 4300 Fabric Switch Installation and Service Manual (620-000171-010, April 2005)
2
Installation Tasks
2-45
Installation Tasks
Figure 2-27 HyperTerminal Dialog Box (2)
14. Click No to exit and close the HyperTerminal application.
15. Power off the maintenance terminal:
a. Click Start at the left side of the task bar and select the Shut
Down option. The Shut Down Windows dialog box appears.
b. At the Shut Down Windows dialog box, select the Shut down
option from the list box and click OK to power off the PC.
16. Disconnect the RS-232 modem cable from the switch and the
maintenance terminal. Replace the protective cap over the
maintenance port.
17. At the switch front panel, press and hold the IML/RESET button
for ten seconds. The switch performs a POR.
18. Connect the switch to the customer-supplied Ethernet LAN
segment. To connect the switch:
a. Connect one end of the Ethernet patch cable (supplied with
the switch) to the RJ-45 connector (labelled 10/100) on the left
front of the switch chassis.
b. Connect the remaining end of the Ethernet cable to the LAN as
directed by the customer’s network administrator.
Task 5: Cable Fibre Channel Ports
Perform this task to connect devices to the switch. To cable Fibre
Channel ports:
1. Route fiber-optic jumper cables from customer-specified Fibre
Channel devices, FC-AL devices, or fabric switches to ports at the
front of the switch.