FW 07.00.00/HAFM SW 08.06.00 McDATA Sphereon 4300 Fabric Switch Installation and Service Manual (620-000171-010, April 2005)

Repair Information
4-29
3. Gently wipe the end-face and other surfaces of the connector
with an alcohol pad as shown in part B of Figure 4-20 on
page 4-28. Ensure the pad makes full contact with the surface to
be cleaned. Wait approximately five seconds for cleaned surfaces
to dry.
4. Repeat step 2 and step 3 of this procedure (second cleaning).
5. Repeat step 2 and step 3 of this procedure again (third cleaning),
then reconnect the fiber-optic cable to the port.
Power-On Procedure
To power on the switch:
1. One alternating current (AC) power cord is required for the
power supply. Ensure a power cord is available to connect the
switch to facility power.
DANGER
Use the supplied power cords. Ensure the facility power receptacle
is the correct type, supplies the required voltage, and is properly
grounded.
2. Plug the power cord into a facility power source and power
supply AC connector at the rear of the switch. When the power
cord is connected, the switch powers on and performs power-on
self-tests (POSTs).
3. During POSTs:
The green power (PWR) LED on the switch front panel
illuminates.
The amber system error (ERR) LED on the switch front
panel blinks momentarily while the switch is tested.
The green LED associated with the Ethernet port blinks
momentarily while the port is tested.
The blue/green and amber LEDs associated with the ports
blink momentarily while the ports are tested.