FW 07.00.00/HAFM SW 08.06.00 McDATA Sphereon 4300 Fabric Switch Installation and Service Manual (620-000171-010, April 2005)
3-60
McDATA Sphereon 4300 Fabric Switch Installation and Service Manual
e. Click the Switch tab, then click the Fabric Parameters tab. The
Fabric Parameters page displays.
f. Type the recommended E_D_TOV and R_A_TOV values, then
click Activate to save the change. The message Your changes
to the fabric parameters configuration have been
successfully activated appears.
g. Repeat steps d through f for the switch attached to the
segmented E_Port (second switch). Use the same E_D_TOV
and R_A_TOV values.
h. Set both switches online. Refer to Set the Switch Online or
Offline on page 4-25.
Did the operating parameter change solve the problem and did both
switches join through the ISL to form a fabric?
NO YES
↓ The switch, associated ISL, and multiswitch fabric appear
operational. Exit MAP.
Contact the next level of support. Exit MAP.
14
A switch E_Port segmented because two fabric elements had
duplicate domain IDs.
a. Work with the system administrator to determine the desired
domain ID (1 through 31 inclusive) for each switch.
b. Notify the customer both switches will be set offline. Ensure the
system administrator quiesces Fibre Channel frame traffic
through the switches and sets attached devices offline.
c. Set both switches offline. Refer to Set the Switch Online or
Offline on page 4-25.
d. At the View panel, select Configure at the left side of the panel.
The Configure panel opens with the Ports page displayed.
e. Click the Switch tab, then click the Parameters tab. The
Parameters page displays.
f. Type the customer-determined preferred domain ID value, then
click Activate to save the change. The message Your changes
to the operating parameters configuration have been
successfully activated appears.