FW 07.00.00/HAFM SW 08.06.00 McDATA Sphereon 4300 Fabric Switch Installation and Service Manual (620-000171-010, April 2005)
3-16
McDATA Sphereon 4300 Fabric Switch Installation and Service Manual
Does the switch appear powered on?
YES NO
↓ A power distribution problem is indicated. Go to step 18 to
obtain event codes. If no event codes are found, go to MAP
0100: Power Distribution Analysis on page 3-18. Exit MAP.
A faulty PWR LED is indicated, but switch and Fibre Channel port
operation is not disrupted. The LED is connected to CTP card
circuitry, and if this problem is a concern to the customer, the switch
must be replaced. Exit MAP.
25
Is the amber ERR LED at the switch front bezel blinking?
YES NO
↓ Go to step 27.
26
Unit beaconing is enabled for the switch.
a. Consult the customer and next level of support to determine the
reason unit beaconing is enabled.
b. Disable unit beaconing at the SANpilot interface.
1. At the View panel, select Operations at the left side of the
panel. The Operations panel opens with the Switch and
Beacon pages displayed.
2. Click Deactivate to disable beaconing. The message Your
changes have been successfully activated appears.
Was unit beaconing enabled because switch failure or degradation
was suspected?
YES NO
↓ The switch appears operational. Exit MAP.
Go to step 20 and perform fault isolation again (at the switch). If this
is the second time at this step, contact the next level of support. Exit
MAP.
27
Is the amber ERR LED at the switch front bezel illuminated?
YES NO
↓ The switch appears operational. Exit MAP.