HP StorageWorks HSG80 ACS Solution Software V8.8 for Linux X86 Installation and Configuration Guide (AA-RV1LA-TE, March 2005)

FC Configuration Procedures
130 HSG80 ACS Solution Software V8.8 for Linux X86 Installation and Configuration Guide
Setting Up a Controller Pair
The following procedures describe how to set up a controller pair.
Powering Up and Establishing Communication
1. Connect the computer or terminal to the controller as shown in Figure 35. The
connection to the computer is through the COM1 or COM2 ports.
2. Turn on the computer or terminal.
3. Apply power to the storage subsystem.
4. Open the file
/etc/uucp/port
5. Configure the computer or terminal as follows:
9600 baud
8 data bits
1 stop bit
—no parity
no flow control
If these lines are not in the port file for the appropriate serial port, enter them
and save the file.
6. Create /DEV/ttys0 by entering the following command:
cd /dev
./MAKEDEV ttyS0
7. Open a terminal window from the Desktop Program menu.
8. Start the Call Up Program (CU) by entering the following command:
cu -p com1
9. Press Enter.
A copyright notice and the CLI prompt is displayed, indicating that you
established a local connection with the controller.
Cabling a Controller Pair
The cabling for a controller pair is shown in Figure 37.