If installing in a cabinet:
Verify that the additional weight of the chassis does not exceed the
cabinets weight limits.
Ensure that all equipment installed in the cabinet is grounded
through a reliable branch circuit connection. Do not rely on a
secondary connection to a branch circuit, such as a power strip.
Ensure that two dedicated electrical branch circuits with the following
characteristics are available for use:
200 to 240 VAC, 50 - 60 Hertz (refer to the “Power Specifications”
on page 71 for additional electrical specifications).
Protected by a circuit breaker in accordance with local electrical
codes.
Supply circuit, line fusing, and wire size that are adequate according
to the electrical rating on the chassis nameplate.
Grounded outlets installed by a licensed electrician and compatible
with the power cords.
Ensure the HP StorageWorks Core Switch 2/64 has access to a
minimum airflow of 350 cubic feet per minute.
Ensure the air temperature measured at the blower inlet does not exceed
40 degrees Celsius during operation.
WARNING For safety reasons, when installing this product in an
equipment rack, you must consider rack stability against tipping. Please
refer to the Hewlett-Packard Rack System/E User's Manual provided with
the equipment rack to determine rack stability (available in electronic
format through the HP Web site at
http://www.hp.com/racksolutions/). If the
necessary stability is not achieved, through the placement of additional
equipment or ballast, the equipment rack must be anchored to the building
structure before operation.
Items Included with the Switch
Figure 3 shows the major items contained in the HP StorageWorks Core
Switch 2/64 shipping carton(s). Table 1 on page 11 lists the contents of the
shipping carton. For instructions on removing the switch from the shipping
carton, refer to page 15.