3.6.0 Matrix Server Upgrade Guide (5697-7085, February 2008)

Chapter 4: Non-Rolling Upgrades 31
Copyright © 1999-2008 PolyServe, Inc. All rights reserved.
Upgrade all servers at once. In the upgrade procedure, complete the
steps for group A on all of the servers.
To perform the upgrade, complete the following steps.
NOTE: Upgrade the server with the highest IP address first. Then
continue to upgrade the servers in descending order of IP address,
with the lowest numbered server being upgraded last.
1. If you are using MxDB for SQL Server, run the MxDB for SQL Server
upgrade tool on each server in group A. (See “The MxDB for SQL
Server Upgrade Tool” on page 7. Be sure to uninstall the upgrade tool
after completing the upgrade.) Also set the Policy on each Virtual SQL
Server to
AUTOFAILBACK before you begin the upgrade. This step
ensures that the Virtual SQL Servers will start on their primary nodes
after the nodes are upgraded to 3.6.0.
2. Stop Matrix Server on each server in group A. (Either issue the
command net stop matrixserver from the Command Prompt, or stop
the product via the Microsoft Management Console Services snap-in.)
Also disable the Matrix Server service on the Microsoft Management
Console Services snap-in.
3. Back up the matrix configuration on each server in group A as
described under “Back Up the Existing Matrix” on page 6.
4. If Instance Aliasing 1.0.3 is installed on the servers in group A, use
Add/Remove Programs to remove the PolyServe Instance Aliasing
Tool service.
5. Uninstall any Matrix Server or Solution Pack hot fixes that have been
applied to the servers in group A. You can use the Control Panel
Add/Remove Programs interface to do this. The hotfixes must be
removed before you uninstall the Solution Packs and Matrix Server.
6. On each server in group A, uninstall the following PolyServe software
if it is installed on the server.Use the Control Panel Add/Remove
Programs interface to do this.
Matrix File Serving Solution Pack for CIFS
Matrix Database Solution Pack for SQL Server