3.5.1 Matrix Server Administration Guide
Chapter 18: SAN Maintenance 312
Copyright © 1999-2007 PolyServe, Inc. All rights reserved.
5. Connect the power and either the Ethernet or the serial console cable
to the new switch.
6. Log on to the new switch.
7. Disable the switch with the switchDisable command.
8. Disable any stale active configuration on the new switch with the
cfgDisable command.
9. Verify that the Brocade licenses are installed by using the licenseShow
command. The new switch should have the same kind of license as the
rest of the fabric.
10. Clear any stale zone configuration on the new switch with the
cfgClear command.
11. Save the clean configuration with the cfgSave command.
12. Configure the new switch. If you saved the original configuration with
the configUpload command, use the configDownload command to
restore it. Otherwise, use the configure command. (You may need to
consult your site’s SAN administrator or your Brocade representative
for the correct configuration information.)
13. Connect the FC connectors to the new switch. Be sure to plug them
into the same ports as on the original switch.
14. Set the Ethernet IP address on the new switch to the IP address of the
original switch. Use the ipAddrSet command.
If you had connected to the switch over the Ethernet interface, the
session will be disconnected and you will need to log back into the
switch with the IP address you just configured.
15. Enable the switch using the switchEnable command. The new switch
should now connect to the rest of the fabric.
16. Verify that the HBAs on the servers log into the new switch in the
expected locations. Also verify that no zone conflicts are being
reported on the inter-switch links (ISL).