on the replacement switch should be removed to allow the fabric to
properly communicate current zoning when the switch joins the
fabric.
6. Add the private community to the Configure > Management > SNMP
tab and ensure that it is write enabled.
7. Connect the FC connectors to the new switch. Be sure to plug them
into the same ports as on the original switch.
8. Bring the switch online.
The new switch should now connect to the rest of the fabric. Verify that
the HBAs on the servers log into the new switch in the expected locations.
To ensure a highly available configuration after the switch has been
replaced, verify that all servers have eligible I/O paths through the
replaced switch. For example, you can use the PowerPath powermt
command to do this.