HP StorageWorks 1000ux/1900ux/2300ux Optical Jukebox Setup Guide (AA966-96002, September 2004)

Unpacking
16 HP StorageWorks 1000ux/1900ux/2300ux Optical Jukebox Setup Guide
7. Secure the ramp to the pallet using the pallet bolts (see Figure 4).
Figure 4: Securing the pallet ramp
8. Loosen the 1/2-inch nut securing the leveler feet and screw the feet up to raise
them away from the pallet.
WARNING: Exercise caution when moving the jukebox. Avoid rolling the
jukebox on rough or uneven surfaces. The jukebox should be moved by at least
two people.
9. Using at least two people, carefully roll the jukebox down the ramp and guide
it to the installation site.
10. Stabilize the jukebox by lowering the leveling feet.
11. Remove the antistatic bag covering the jukebox.
Note: Inspect the jukebox for any damage that may have occurred during shipment.
Pay special attention to areas behind any scuffs on the anti-static bag. If damage is
detected, contact your authorized service representative.